This website uses cookies. If you continue browsing we consider that you agree to its use. More info | Accept
es en

Projects


Results can be filtered by project type using the following drop-down menu

TIENDA WONG - SEDE ASIA 1

WONG STORE, HEADQUARTERS IN ASIA

Peru, LIMA · 2016
Categoy: Commertial building, COMMERCIAL VENUES
Construction surface (m2): 2.500
Specialization: AIR CONDITIONING
Six SPLIT-type air conditioning system with a capacity of 20 Tn, and ventilation.
UNIVERSIDAD DE PIURA 1

UNIVERSITY OF PIURA

Peru, PIURA · 2015
Categoy: Institutional building, UNIVERSITIES
Construction surface (m2): 3.000
Specialization: FP, PUMP
Detection and extinguishing system using a 750 GLP electric pump, sprinkler network and cabinets for 3 classroom levels./p>
UNIVERSIDAD UTP - SEDE AV. AREQUIPA 1

UTP UNIVERSITY, HEADQUARTERS OF AREQUIPA

Peru, LIMA · 2015
Categoy: Institutional building, UNIVERSITIES
Construction surface (m2): 18.000
Specialization: FP, PUMP
Detection and extinguishing system using a 750 GLP pump, sprinkler network and cabinets for 4 basements and 13 stories.
UNIVERSIDAD UTP - SEDE LIMA NORTE 1

UTP UNIVERSITY HEADQUARTERS IN LIMA NORTE

Peru, LIMA · 2016
Categoy: Institutional building, UNIVERSITIES
Construction surface (m2): 15.000
Specialization: FP, PUMP
Detection and extinguishing system using a 500 GLP pump, sprinkler network and cabinets for 12 stories.
ALMACEN DEL CENTRO LOGISTICO ZARA ARGENTINA

WAREHOUSE OF LOGISTICS CENTER FOR ZARA ARGENTINA

Argentina, TORTUGAS, BUENOS AIRES · 1999
Categoy: Industrial building, LOGISTICS CENTERS
Installed power (KW): 4.536
Construction surface (m2): 30.000
Specialization: HEATING, VENTILATION, SOUND SYSTEM, ELECTRICITY, FP, SAFETY, VAPOR GENERATION, PUMP GROUP
Installation of heating by means of natural gas boilers used for the production of hot water and its distribution to aerothermal-type terminal elements located inside the logistics center. Forced ventilation system comprised of mushroom-type air-impulse fans and extractors located on the roof as well as heating in the central building. Steam generation plant with natural gas boiler for the production of dry steam at the garments ironing center in the logistics center building. Generation of compressed air for the garments conveyor line. Automated fire detection system equipped with heat detectors and a central station comprising 60 areas. Fire extinguishing systems comprising sprinklers and hand-held extinguishers. Diesel-powered main pump group and electric jockey pump. Network of equipped fire hydrants. Installation of a security system comprised of dome-type and fixed-type surveillance cameras as well as movement sensors inside the building and perimeter sensors along the outside area. Evacuation, signs and loudspeakers..
AEROPUERTO BAHIA BLANCA
AEROPUERTO BAHÍA BLANCA 1
AEROPUERTO BAHÍA BLANCA 2

BAHIA BLANCA AIRPORT

Argentina, BUENOS AIRES · 2017
Categoy: Transport infrastructures, AIRPORTS
Installed power (KW): 18
Specialization: AIR CONDITIONING, HEATING, ELECTRICITY, CIVIL WORKS
Remodeling of water, gas, electricity and sanitary installations. Bathrooms, carpentry and finishes.
BIMBO VILLA TESEI

BIMBO VILLA TESEI

Argentina, BUENOS AIRES · 2017
Categoy: Industrial building, INDUSTRIAL PLANT
Installed power (KW): 101
Construction surface (m2): 600
Specialization: CIVIL WORKS, MAINTENANCE
Several civil works actions at the Bimbo Villa Tesei industrial plant, including the construction of a perimeter dividing line, outer wall painting and maneuvering hangar paving in the logistics sector. Maintenance
GENERAL MILLS 1

GENERAL MILLS

Argentina, BUENOS AIRES · 2017
Categoy: Industrial building, INDUSTRIAL PLANT
Specialization: AIR CONDITIONING, MAINTENANCE
Yearly maintenance service and reparation of the plant's air conditioning installations.
2 3 4 5 6